How to Set a Budget and Show Budget vs Actual

Reports 3 min read Updated Aug 14, 2026
On this page
  1. Before you begin
  2. Step-by-step instructions
  3. Step 1: Open the Budgeting view
  4. Step 2: Open the budget editor
  5. Step 3: Review the editor
  6. Step 4: Choose a scenario
  7. Step 5: Start from the company’s accounts
  8. Step 6: Or import your own file
  9. Step 7: Or import the QuickBooks budget
  10. Step 8: Phase a line across the year
  11. Step 9: Set the monthly amounts
  12. Step 10: Save the budget
  13. Step 11: Choose how to view it
  14. Step 12: Import, export or review history
  15. Step 13: Pick an action
  16. Step 14: Compare against actuals
  17. What happens next
  18. Troubleshooting
  19. Related articles

Who this is for: Accountants who want to compare a client’s results against a plan.

What you’ll learn: How to build a budget for a company, keep alternative scenarios, and show Budget vs Actual in a report.

Before you begin

  • Budgets belong to the company, not to one report. Set the budget once for the fiscal year and every monthly report uses its own month.
  • To show the comparison in a report, add the Budget vs Actual section in Edit Report Sections.

Step-by-step instructions

Step 1: Open the Budgeting view

In the company’s Reports tab, switch from Reports to Budgeting.

Budgeting view selector highlighted in the Reports workspace

Step 2: Open the budget editor

Select Edit budget.

Edit budget button highlighted in the Budgeting workspace

Step 3: Review the editor

The editor holds one line per account, each with an annual amount, and shows the annual total as you work.

Budget editor window with account lines and annual amounts

Step 4: Choose a scenario

Use Scenario to keep a Base, Optimistic or Conservative plan. Reports always use the Base budget; the other two are alternative plans you can maintain alongside it.

Base, Optimistic and Conservative scenario selector highlighted in the budget editor

Step 5: Start from the company’s accounts

Select Fill from P&L accounts to create a line for every account on the client’s Profit & Loss, so the labels match exactly.

Fill from P&L accounts button highlighted in the budget editor

Step 6: Or import your own file

Select Import CSV to bring a budget in from a spreadsheet.

Import CSV button highlighted in the budget editor

Step 7: Or import the QuickBooks budget

Select Import from QuickBooks to pull a budget the client already keeps in QuickBooks.

Import from QuickBooks button highlighted in the budget editor

Step 8: Phase a line across the year

An annual amount splits evenly across twelve months. To handle seasonality, expand a line with the arrow beside it.

Phase by month arrow highlighted on a budget line

Step 9: Set the monthly amounts

Enter each month’s figure. The report’s own month is highlighted. You can also grow the line by a percentage, or track it as a percentage of another line.

Expanded budget line showing the twelve monthly amount fields

Step 10: Save the budget

Select Save changes (or Create budget the first time).

Save changes button highlighted in the budget editor

Step 11: Choose how to view it

Back in the workspace, use the control bar to switch between the Budget table and vs Actual, to change scenario, and to break the budget down Company-wide, By class or By department.

View, Scenario and Breakdown control bar highlighted in the Budgeting workspace

Step 12: Import, export or review history

The three-dot menu beside Edit budget holds the extra actions.

More actions button highlighted beside Edit budget

Step 13: Pick an action

Choose Import from QuickBooks, Export CSV, or Budget history to see every saved version of the budget.

More actions menu open with Import from QuickBooks, Export CSV and Budget history

Step 14: Compare against actuals

Switch the view to vs Actual to see the variance against the company’s live QuickBooks figures. Set an Alert threshold % to flag lines that miss by more than you allow, and select Explain variances for an AI summary of what moved.

vs Actual view selector highlighted in the Budgeting workspace

What happens next

Any report with the Budget vs Actual section picks the budget up automatically. The section shows the month, the year to date and a full-year projection, the largest variances as a chart, and a variance table by account. Beating budget on revenue and staying under budget on expenses are both shown as favourable.

Budget vs Actual section highlighted in a finished report

Troubleshooting

  • The section says no budget has been set. The company has no saved budget for that fiscal year. Build one on the Budgeting view.
  • Import from QuickBooks found nothing. The client keeps no detailed budget in QuickBooks for that year — enter it manually or import a CSV instead.
  • vs Actual can’t load. The comparison needs a live QuickBooks connection. Reconnect the company and try again.
  • A class or department breakdown isn’t in the client’s PDF. That breakdown is a workspace view only; delivered reports always freeze the company-wide budget.
Was this article helpful?
Still stuck?

Watch it done, or see how financial reports fits the rest of the platform.

Financial reports Contact us